Millennium Line Rapid Transit Project

Millennium Line Rapid Transit Project / Lower Mainland, BC


The Millenium Line is the second rapid transit line built in the SkyTrain system of Metro Vancouver. The Line opened in 2002 for service and follows the Expo Line from Waterfront to Columbia Stations, then loop back into Vancouver via a new route, passing through Commercial-Broadway Station again, at a different platform, and terminating at VCC-Clark Station. WPE completed systemwide electrical installations and the fit-out of select project stations.

r_IMG_0618_1opt.jpg r_Brentwood_town_Station_.jpg
r_IMG_0443_1opt.jpg r_1106581_sm.jpg

experience counts

Since 1973, innovation and an enthusiasm for challenging projects has made Western Pacific Enterprises one of Western Canada’s largest electrical contractors.

meet our team